The packaged treatment plant for 400 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-400. The system has a daily wastewater treatment capacity of 75-80 m³/day and is made of ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. Installation on-site takes 8-11 days, comes with a 12-month warranty, and is delivered as a turnkey service.
Who Is This Capacity For?
Designed for a capacity of 300-500 people for medium-sized settlements and businesses:
- Medium-sized hotels — holiday resorts with 50-100 rooms
- Apartment complexes — complexes with 80-150 apartments
- School campuses — primary-secondary schools, kindergartens
- Health centers and clinics — small health facilities
- Industrial campuses — small-medium factories
- Sports facilities and camps — summer schools, youth camps
Typical Use Scenarios
Typical usage examples:
- 300-room 4-star hotel: Sufficient capacity for high occupancy during the summer season, reclaimed water for irrigation.
- 150-unit residential complex: To avoid overloading the municipal wastewater system in medium-large city center housing projects.
- Private school with 500 students: Dining hall + sports facilities + service workshop treated in a single facility.
- 75-bed hospital: UV disinfection is mandatory for healthcare wastewater — standard addition at these capacities.
Proposed Technology
The technology we recommend for this capacity:
- Classic biological activated sludge — basic setup
- MBR optional — if 95% of the treated water will be reused for irrigation
- UV disinfection — mandatory for hospital/hotel/public facilities
- Advanced N-P removal — if there are strict discharge limits
*The MBR + UV combination is common in hotel/hospital projects.*
Technical Details
Technical specifications (400 people / 75-80 m³/day):
- Reactor material: ST37 carbon steel, 4-6 mm thickness
- Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
- BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
- COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
- SS removal: 95+% (outlet 20-30 mg/L)
- NH4-N removal: 85-90% (advanced biological process)
- Automation: PLC controlled, SCADA remote monitoring optional
- Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
- Footprint: Reactor only + 1 m service area
- Warranty: Mechanical 12 months, body 5 years
- Certificates: CE, ISO 9001, ISO 14001
Investment & Return
Investment analysis for a system of 400 people:
- Annual treated water: ~29,200 m³
- Reusable water (for irrigation): ~24,820 m³ (85%)
- Operational savings (water bill): Between 25-40% of total annual water expenses
- Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
- Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits
- Estimated payback period: Typically between 2-4 years
- Equipment lifespan: 15-20 years (over 70% of investment lifespan is profit)
- Sustainability: Direct contribution to the conservation of water resources
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
400 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.