Sungurlu Correctional Institution

Year
2022
Region
Çorum
Country
Türkiye
Capacity
Revizyon
Process
Borulama ve Sıcak Su Sistem Değişimi
Client
Sungurlu Ceza İnfaz Kurumu

Project Details

About the Çorum Wastewater Treatment Plant Project

Çorum - Sungurlu Penitentiary Institution

This wastewater treatment plant project carried out in Çorum for the Sungurlu Penitentiary Institution is a Revision capacity project. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer.

Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project LocationÇorum
Client / InstitutionMinistry of Justice of the Republic of Turkey
CapacityRevision
Process TypePiping and Hot Water System Replacement
Completion Year2022
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

The plant has been designed with process stages suitable for the characterization of wastewater. Additionally, it has been optimized to meet the target discharge limits.

Closed Facility Wastewater Characteristics

Penitentiary institutions produce domestic character wastewater. Due to the closed environment conditions, it presents a balanced flow profile. Therefore, packaged systems are the ideal solution. Moreover, high disinfection and continuous operational reliability are prioritized.

Outcome and Reference Value

At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Also, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical proposal. Additionally, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience specifically in the wastewater treatment plant field, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Abroad, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We can offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    On
    site installation and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting