Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Zonguldak Provincial Special Administration (1)

Year
2022
Region
Zonguldak
Country
Türkiye
Capacity
400 Kişi / Gün Kapasiteli
Process
Paket Arıtma Tesisi
Client
Zonguldak İl Özel İdaresi (1)

Project Details

About the Package Treatment Project

package treatment - Zonguldak Provincial Special Administration (1)

This package treatment project carried out in Zonguldak for the Zonguldak Provincial Special Administration (1) has a capacity of 400 People / Day. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationZonguldak
Client / Institutionİller Bankası A.Ş
Capacity400 People / Day Capacity
Process TypePackage Treatment Facility
Completion Year2022
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

The package wastewater treatment system is a compact solution pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.

Sectoral Wastewater Evaluation

Accurate engineering design is the foundation of the project's success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.

Conclusion and Reference Value

At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical suggestions. In addition, we offer consultancy services for increasing the capacity or modernization of your existing facility. With over 20 years of experience in the field of package treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Abroad, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We can offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    Field assembly and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting
Write via WhatsApp Get a Quick Quote