Çitlekçi Dried Fruits Inc.

Gıda Sektörü

Sector
Gıda Sektörü
Yapım Yılı
2026
Bölge
Kırıkkale
Country
Kapasite
1000 Kişi / Gün Kapasiteli
Proses
Paket Arıtma Tesisi
Müşteri
Çitlekçi Kuruyemiş A.Ş

Project Details

About the Package Treatment Project

package treatment - Çitlekçi Kuruyemiş A.Ş

Çitlekçi Kuruyemiş A.Ş has implemented this package treatment project in Kırıkkale with a capacity of 1000 Persons / Day. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out by our company. This ensures a coordinated and error-free delivery to the customer from a single source.

Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project Location Kırıkkale
Capacity 1000 Persons / Day Capacity
Process Type Package Treatment Facility
Completion Year 2026
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. Modular expansion capability offers long-term advantages.

Sectoral Wastewater Evaluation

Accurate engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.

Project Scope and Workflow

Throughout the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  • Wastewater characterization analysis and sample examination
  • Process design and engineering calculations
  • Mechanical, electrical, and automation documentation
  • Equipment procurement and factory acceptance tests
  • On-site installation and hydraulic tests
  • Biological adaptation and commissioning
  • Operator training and technical documentation delivery
  • SKKY compliance tests and official reporting

Conclusion and Reference Value

At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical recommendations. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of package treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.