Kırşehir Slaughterhouse

Year
2023
Region
Kırşehir
Country
Türkiye
Capacity
200 m³ / Gün Kapasiteli
Process
Endüstriyel Atıksu Arıtma Tesisi
Client
Orm-Et Mezbahası

Project Details

About the Kırşehir Wastewater Treatment Plant Project

Kırşehir - Kırşehir Slaughterhouse

This wastewater treatment plant project carried out in Kırşehir for the Orm-Et Slaughterhouse has a capacity of 200 m³ / Day. The project was completed in 2023 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationKırşehir
Capacity200 m³ / Day Capacity
Process TypeIndustrial Wastewater Treatment Plant
Completion Year2023
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is employed. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent meets discharge limits.

Wastewater Characteristics of the Slaughterhouse Sector

Slaughterhouse wastewater contains high levels of blood, fat-oil-grease (FOG), and organic load. COD values typically range from 3,000 to 8,000 mg/L. Additionally, nitrogen and phosphorus concentrations are also high. DAF (Dissolved Air Flotation) pre-treatment is mandatory in this sector. Subsequently, high-efficiency treatment is achieved through biological processes.

Conclusion and Reference Value

At the end of the project, the effluent was produced at a quality that meets SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Slaughterhouse Wastewater Treatment Guide. Furthermore, our articles such as how industrial wastewater is treated and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical suggestions. Additionally, we offer consultancy services for increasing the capacity or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant field, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Abroad, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We can offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment supply and factory acceptance tests
  5. 5
    On
    site installation and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting