Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Osmaneli Organized Industrial Zone

Year
2025
Region
Bilecik
Country
Capacity
1000 Person / Day Capacity
Process
Package Treatment Plant
Client
Osmaneli Organized Industrial Zone

Project Details

About the Package Treatment Project

package treatment - Osmaneli OSB

This package treatment project, carried out in Bilecik for Osmaneli OSB, has a capacity of 1000 Persons / Day. It has been conducted within Osmaneli OSB. The project will be completed in 2025 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes have been managed by our company. This ensures a coordinated and error-free delivery to the customer from a single source.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides a quick overview of the project scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Bilecik
Client / Institution Osmaneli OSB
Capacity 1000 Persons / Day Capacity
Process Type Package Treatment Facility
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. It also provides compact space utilization. The modular expansion capability offers long-term advantages.

OSB Wastewater Management

The wastewater of the Organized Industrial Zone is a heterogeneous mixture from different sectors. Acceptance standards of member factories are fundamental to success. Additionally, the central facility should be designed with a multi-barrier structure. Automation and continuous monitoring are essential for a modern OSB facility.

Conclusion and Reference Value

At the end of the project, the effluent has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Furthermore, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Package treatment guide. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of package treatment. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Abroad, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We can offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    Field assembly and hydraulic tests
    site assembly and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting
Write via WhatsApp Get a Quick Quote