Project Details
About the MBBR Treatment Project

This MBBR treatment project for Zeki Grup Inc. was carried out in Erbil, Iraq and has a capacity of 10 m³ / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer.
Technical Specifications and Capacity
The basic technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.
Applied MBBR Treatment Technology
MBBR (Moving Bed Biofilm Reactor) technology provides high shock load resistance. Biofilm grows on plastic carriers. This keeps the suspended biomass stable. Additionally, the operating cost is low. Therefore, it is a preferred choice for wastewater with fluctuating load profiles.
Wastewater Characteristics of Construction Projects
Construction sector projects generate standard domestic wastewater. Capacity sizing based on the number of users is the primary criterion. Additionally, the modular expansion capability is an important advantage for future capacity increases.
Conclusion and Reference Value
At the end of the project, the effluent was produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Furthermore, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, the MBR vs MBBR guide can be reviewed. Additionally, our articles on industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for increasing the capacity of your existing facility or modernization. With over 20 years of experience in the MBBR treatment field, we provide reliable solutions to the industry. For more information, please contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment supply and factory acceptance tests
-
5
Field assembly and hydraulic testssite installation and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting