Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 19 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

500 Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 500 people — daily flow rate of 95-100 m³/day, 9-12 days installation.

500
Person Capacity
95-100 m³/gün
Daily Flow
2.20×9.50×2.70 m
Dimensions (W×L×H)
9-12 gün
Installation Time
ARBİO-500
Model Code

The packaged treatment plant for 500 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-500. The system, with a daily wastewater treatment capacity of 95-100 m³/day, has a ST37 carbon steel body (4-6 mm) and a lifespan of 15-20 years. Installation in the field takes 9-12 days, with a 12-month warranty and turnkey service.

Who Is This Capacity For?

Capacity of 500-900 people for large settlement and institutional projects:

  • Large hotels — resort, boutique hotel with 100-200 rooms
  • Residential complexes — mega project area with 150-300 apartments
  • University campuses — dormitory + academic building
  • Hospitals and health centers — 50-100 bed capacity
  • Military facilities — barracks, training center, logistics camp
  • Industrial parks — small organized industrial zones, organized small industry
  • Shopping centers — medium-sized shopping mall

Typical Use Scenarios

Typical usage examples:

  • 150-room resort hotel (Antalya/Bodrum): Treats wastewater for use in landscaping instead of discharging into the sea.
  • 300-apartment site (Istanbul): Pre-treatment before discharge to municipal sewer — more economical subscription.
  • 100-bed city hospital: UV disinfection + advanced biological N-P removal as standard.
  • Medium factory within an industrial zone: Pre-treatment to meet sectoral discharge limits.

Proposed Technology

The technology we recommend for this capacity:

  • MBR (Membrane Bioreactor) — standard if there is a water recovery goal
  • Advanced biological N-P removal — for Turkey's SKKY advanced limits
  • UV disinfection — for hospitals, hotels, public areas
  • Sludge thickening — decanter or belt press
  • PLC SCADA automation — remote monitoring

*The MBR + UV + advanced N-P combination is standard in resort hotel and hospital projects.*

Technical Details

Technical specifications (500 people / 95-100 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certifications: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a system of 500 people:

  • Annual treated water: ~36,500 m³
  • Reusable water (for irrigation): ~31,025 m³ (%85)
  • Operational savings (water bill): Between 25-40% of total annual water expenses
  • Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
  • Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits
  • Estimated payback period: Typically between 2-4 years
  • Equipment lifespan: 15-20 years (over 70% of investment lifespan is profit)
  • Sustainability: Direct contribution to the conservation of water resources
Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance

500 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın

Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.

Write via WhatsApp Get a Quick Quote