900 Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 900 people — daily flow rate of 175-180 m³/day, installation time of 13-16 days.

900
Person Capacity
175-180 m³/gün
Daily Flow
2.20×12.50×2.70 m
Dimensions (W×L×H)
13-16 gün
Installation Time
ARBİO-900
Model Code

The 900-person packaged treatment plant is manufactured at our Ankara factory in Turkey under the model name ARBİO-900. The system has a daily wastewater treatment capacity of 175-180 m³/day and is made of ST37 carbon steel body (4-6 mm), ensuring a lifespan of 15-20 years. Installation on-site takes 13-16 days, with a 12-month warranty and turnkey service.

Who Is This Capacity For?

Capacity for 900-1500 people for high population complexes:

  • 5-star resort hotels — luxury tourism with 200-400 rooms
  • Mega housing projects — sites with 300-600 apartments
  • Educational campuses — dormitory + student living area
  • Hospital complexes — city hospitals with 150-250 beds
  • Mega military complexes — training and headquarters
  • Exhibition and congress centers — event facilities

Typical Use Scenarios

Typical usage examples:

  • 400-room 5-star resort: Water recovery is critical — 95% reuse in landscape irrigation, saving over 50,000 m³ annually.
  • 600-unit mega housing project: Standalone eco-friendly solution in areas without municipal discharge limits.
  • 200-bed city hospital: Advanced biological N-P + UV — special health wastewater profile.
  • University campus with 5000 students: Dormitory + academic + service facilities treated at a single point.

Proposed Technology

The technology we recommend for this capacity:

  • MBR or MBBR — selected according to needs (MBR for water recovery, MBBR for cost-effectiveness)
  • Advanced biological N-P removal — mandatory
  • UV + ozone disinfection — dual-stage safety
  • Sludge dewatering — belt press or decanter
  • Complete SCADA automation — operator panel + remote monitoring + alarm
  • Backup pump/blower — redundancy for reliability

Technical Details

Technical specifications (for 900 people / 175-180 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certificates: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a system with 900 people:

  • Annual treated water: ~65,700 m³
  • Reusable water (for irrigation): ~55,845 m³ (85%)
  • Operational savings (water bill): Between 25-40% of total annual water expenses
  • Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
  • Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits
  • Estimated payback period: Typically between 2-4 years
  • Equipment lifespan: 15-20 years (70%+ of investment lifespan is profit)
  • Sustainability: Direct contribution to the conservation of water resources
Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance