Project Details
About the Baku Reinforced Concrete Wastewater Treatment Project

Hinal Group LLC. This reinforced concrete wastewater treatment project carried out in Baku, Azerbaijan has a capacity of 1500 Persons / Day. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the client.
Technical Specifications and Capacity
The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.
Applied Reinforced Concrete Wastewater Treatment Technology
The reinforced concrete domestic wastewater treatment plant is a long-lasting solution with a field construction structure. The typical lifespan is 30+ years. It is an ideal building block for high capacity and continuous operation. Additionally, the activated sludge process is a standard biological stage.
Sectoral Wastewater Assessment
Accurate engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Furthermore, SKKY compliance is a minimum requirement for every project.
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
- Wastewater characterization analysis and sample examination
- Process design and engineering calculations
- Mechanical, electrical, and automation documentation
- Equipment procurement and factory acceptance tests
- On-site assembly and hydraulic tests
- Biological adaptation and commissioning
- Operator training and technical documentation delivery
- SKKY compliance tests and official reporting
Conclusion and Reference Value
At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical proposal. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of reinforced concrete wastewater treatment. For more information, you can contact us through our contact page.