Project Details
About the Baku Reinforced Concrete Wastewater Treatment Project

Hinal Group LLC. has implemented this reinforced concrete wastewater treatment project in Baku, Azerbaijan, with a capacity of 1500 Persons / Day. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer.
Technical Specifications and Capacity
The main technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.
Applied Reinforced Concrete Wastewater Treatment Technology
The reinforced concrete domestic wastewater treatment plant is a long-lasting solution with a construction structure. The typical lifespan is over 30 years. It is an ideal building block for high capacity and continuous operation. Additionally, the activated sludge process is a standard biological stage.
Sectoral Wastewater Assessment
Accurate engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Furthermore, SKKY compliance is a minimum requirement for every project.
Conclusion and Reference Value
At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, the Industrial Wastewater Treatment Guide can be reviewed. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions in the field of reinforced concrete wastewater treatment. For more information, you can contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Field assembly and hydraulic testssite assembly and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting