Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

İrmis Construction Inc.

Sector Construction Sector
Year 2026
Region Bakü, Azerbaycan
Country Azerbaijan
Capacity Capacity of 300 Persons / Day
Process Package Treatment Plant
Client İrmis Construction Inc.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - İrmis Construction Inc.

İrmis Construction Inc. has completed this package treatment project in Baku, Azerbaijan, with a capacity of 300 Persons / Day. It has been carried out under the Ministry of Forestry of the Republic of Turkey. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Baku, Azerbaijan
Client / Institution Republic of Turkey Ministry of Forestry
Capacity Capacity of 300 People / Day
Process Type Package Treatment Facility
Completion Year 2026
Discharge Standard SKKY (Water Pollution Control Regulation)

Irmis Construction Inc. - Applied Package Treatment Technology

Package wastewater treatment system is a compact solution that is pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.


Wastewater Characteristics of Construction Project

The construction sector projects produce standard domestic wastewater. Capacity sizing according to the number of users is a fundamental criterion. Additionally, the modular expansion capability is an important advantage for future capacity increases.


Result and Reference Value

Irmis Construction Project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote