Project Details
About the Turkmenistan Wastewater Treatment Plant Project

Baysu Arıtma A.Ş has carried out this wastewater treatment plant project in Turkmenistan with a Lamella & Settling capacity. The project is scheduled for completion in 2024 as a turnkey project. Additionally, the design, equipment procurement, installation, and commissioning processes have been conducted within our company. This ensures a coordinated and error-free delivery to the client.
Technical Specifications and Capacity
The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.
Applied Wastewater Treatment Plant Technology
The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach encompasses pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent meets discharge limits.
Sectoral Wastewater Assessment
Accurate engineering design is fundamental to the project's success. Wastewater characterization and target discharge limits determine the design output. Furthermore, SKKY compliance is a minimum requirement for every project.
Conclusion and Reference Value
At the end of the project, the effluent was produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical suggestions. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, please contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Onsite installation and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting