Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Günka Construction Inc.

Year 2025
Region Aydın
Country Turkey
Capacity 1000 Person / Day Capacity
Process Package Treatment Plant
Client Günka Construction Inc.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - Günka Construction Inc.

Günka Construction Inc. has implemented this package treatment project in Aydın with a capacity of 1000 Persons / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project LocationAydın
Client / InstitutionTOKİ
Capacity1000 Persons / Day Capacity
Process TypePackage Treatment Plant
Completion Year2025
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation to be 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.


Residential Project Wastewater Characteristics

TOKİ and mass housing projects generate domestic wastewater. Sizing according to the number of users is critical. Additionally, the possibility of modular expansion provides a significant advantage for social structure projects. Rapid installation is preferred in line with the construction site process with package solutions.


Result and Reference Value

At the end of the project, the effluent has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This has maximized operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical suggestions. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote