Nermin Group

Year 2024
Region Kuzey Makedonya
Country North Macedonia
Capacity 1000 Person / Day Capacity
Process Package Treatment Plant
Client Nermin Group

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - Nermin Group

This Package Treatment project carried out for Nermin Group in North Macedonia has a capacity of 1000 Persons / Day. The project was completed in 2024 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationNorth Macedonia
Capacity1000 People / Day Capacity
Process TypePackage Treatment Plant
Completion Year2024
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.


Sectoral Wastewater Evaluation

Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the effluent has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.

For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary study and technical proposal. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of package treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote