Biotrend Inc.
Project Gallery Görseller yakında eklenecek
About the Package Treatment Project

Biotrend Inc. has implemented this package treatment project in Çanakkale with a capacity of 200 Persons / Day. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.
Technical Specifications and Capacity
The basic technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.
Applied Package Treatment Technology
Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.
Sectoral Wastewater Evaluation
Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.
Biotrend - Project Scope and Workflow
During the Biotrend Project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
- Wastewater characterization analysis and sample examination
- Process design and engineering calculations
- Mechanical, electrical, and automation documentation
- Equipment procurement and factory acceptance tests
- On-site assembly and hydraulic tests
- Biological adaptation and commissioning
- Operator training and delivery of technical documentation
- SKKY compliance tests and official reporting
Result and Reference Value
Biotrend Inc. - The 200-person Package Treatment facility project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for the capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.