Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Cumhuriyet Sausages

Sector Slaughterhouse Wastewater Treatment
Year 2018
Region Afyonkarahisar
Country Turkey
Capacity 80 m³ / Day Capacity
Process Package Treatment Plant
Client Cumhuriyet Sausages

Project Gallery Görseller yakında eklenecek

About the Cumhuriyet Sausages Treatment Project

package treatment - Cumhuriyet Sucukları

Cumhuriyet Sucukları's package treatment project, carried out in Afyonkarahisar, has a capacity of 80 m³ / Day. The project was completed in 2018 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Applied Package Treatment Technology

Cumhuriyet Sausages Package Treatment wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.

Project Technical Information
Project Location Afyonkarahisar
Capacity  80 m³ / Day Capacity
Process Type Slaughterhouse Wastewater Treatment Facility
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Wastewater Characteristics of the Slaughterhouse Sector

Slaughterhouse wastewater contains high levels of blood, fats, oils, and greases (FOG) and organic load. COD values typically range between 3,000-8,000 mg/L. Additionally, nitrogen and phosphorus concentrations are also high. DAF (Dissolved Air Flotation) pre-treatment is mandatory in this sector. Subsequently, high-efficiency treatment is achieved through a biological process.


Result and Reference Value

The Republic sausage slaughterhouse wastewater treatment facility project has produced effluent that meets the quality standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of package treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote