Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Zeki Group Inc.

Year 2025
Region Erbil, Irak
Country Iraq
Capacity 10 m³ / Day Capacity
Process MBBR Wastewater Treatment Plant
Client Zeki Group Inc.

Project Gallery Görseller yakında eklenecek

About the MBBR Treatment Project

MBBR treatment - Zeki Grup Inc.

This MBBR treatment project for Zeki Grup Inc. was carried out in Erbil, Iraq and has a capacity of 10 m³ / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Erbil, Iraq
Capacity 10 m³ / Day Capacity
Process Type MBBR Wastewater Treatment Plant
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied MBBR Treatment Technology

MBBR (Moving Bed Biofilm Reactor) technology provides high shock load resistance. Biofilm grows on plastic carriers. This keeps the suspended biomass stable. Additionally, the operating cost is low. Therefore, it is a preferred choice for wastewater with fluctuating load profiles.


Wastewater Characteristics of Construction Projects

Construction sector projects generate standard domestic wastewater. Capacity sizing based on the number of users is the primary criterion. Additionally, the modular expansion capability is an important advantage for future capacity increases.


Conclusion and Reference Value

At the end of the project, the effluent was produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Furthermore, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, the MBR vs MBBR guide can be reviewed. Additionally, our articles on industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for increasing the capacity of your existing facility or modernization. With over 20 years of experience in the MBBR treatment field, we provide reliable solutions to the industry. For more information, please contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote