Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Inebolu Municipality

Published: ~2 min read
Year
2025
Region
Kastamonu
Country
Capacity
1500 Persons / Day Capacity
Process
Package Treatment Plant
Client
Inebolu Municipality

Project Details

About the Package Treatment Project

package treatment - İnebolu Municipality

İnebolu Municipality implemented this package treatment project in Kastamonu with a capacity of 1500 Persons / Day. It has been carried out under the scope of İnebolu Municipality. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted by our company. This ensured a coordinated and error-free delivery to the customer from a single source.

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Kastamonu
Client / Institution İnebolu Municipality
Capacity 1500 People / Day Capacity
Process Type Package Treatment Plant
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.

Municipal facilities require high flow rates and continuous operation. Compliance with SKKY discharge standards is essential. Additionally, environmental licensing and SEÇBİS integration are important components of a modern municipal facility.

At the end of the project, the discharge water has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of package treatment. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Related Projects

Other reference projects in the same sector and process type.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote