Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

TŞOF - Kulu

Sector Resting Facility
Year 2020
Region Konya
Country Turkey
Capacity 1000 Person / Day Capacity
Process Package Treatment Plant
Client TŞOF - Kulu

Project Gallery Görseller yakında eklenecek

TŞOF - About the Kulu Package Treatment Project

Package Treatment - TŞOF - Kulu

TŞOF - Kulu is a package treatment project carried out in Konya with a capacity of 1000 Persons / Day. It has been conducted under the umbrella of the Drivers Federation. The project was completed in 2020 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Applied Package Treatment Technology

TŞOF - Kulu Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.

Project Technical Information
Project Location Konya
Capacity 2000 m³ / Day Capacity
Process Type Package Wastewater Treatment Facility
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Sectoral Wastewater Evaluation

Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

The Tşof Konya / Kulu Project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Package Treatment guide. Our articles also address different aspects of the subject, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote