Biotrend Inc.

Published: Updated: ~3 min read
Year
2022
Region
Çanakkale
Country
Capacity
200 Person / Day Capacity
Process
Package Treatment Plant
Client
Biotrend Inc.

Project Details

About the Package Treatment Project

Package Treatment

Biotrend Inc. has implemented this package treatment project in Çanakkale with a capacity of 200 Persons / Day. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.

The basic technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Çanakkale
Capacity 200 Persons / Day Capacity
Process Type Package Treatment Facility
Completion Year 2022
Discharge Standard SKKY (Water Pollution Control Regulation)

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.

Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.

During the Biotrend Project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  • Wastewater characterization analysis and sample examination
  • Process design and engineering calculations
  • Mechanical, electrical, and automation documentation
  • Equipment procurement and factory acceptance tests
  • On-site assembly and hydraulic tests
  • Biological adaptation and commissioning
  • Operator training and delivery of technical documentation
  • SKKY compliance tests and official reporting

Biotrend Inc. - The 200-person Package Treatment facility project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for the capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Related Projects

Other reference projects in the same sector and process type.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote