Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Baysu Treatment Inc.

Year
2024
Region
Türkmenistan
Country
Capacity
Lamella & Çöktürme
Process
Endüstriyel Atıksu Arıtma Tesisi
Client
Baysu Arıtma A.Ş

Project Details

About the Turkmenistan Wastewater Treatment Plant Project

Turkmenistan - Baysu Arıtma A.Ş

Baysu Arıtma A.Ş has carried out this wastewater treatment plant project in Turkmenistan with a Lamella & Settling capacity. The project is scheduled for completion in 2024 as a turnkey project. Additionally, the design, equipment procurement, installation, and commissioning processes have been conducted within our company. This ensures a coordinated and error-free delivery to the client.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationTurkmenistan
CapacityLamella & Settling
Process TypeIndustrial Wastewater Treatment Plant
Completion Year2024
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach encompasses pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent meets discharge limits.

Sectoral Wastewater Assessment

Accurate engineering design is fundamental to the project's success. Wastewater characterization and target discharge limits determine the design output. Furthermore, SKKY compliance is a minimum requirement for every project.

Conclusion and Reference Value

At the end of the project, the effluent was produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical suggestions. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, please contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-step process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For packaged treatment systems, a period of 2-8 weeks is anticipated, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An expedited production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the lifelong efficient operation of your facility with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the opportunity for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price offer based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Abroad, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We can offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    On
    site installation and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting
Write via WhatsApp Get a Quick Quote