The packaged treatment plant for 800 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-800. The system has a daily wastewater treatment capacity of 155-160 m³/day and is made of ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. Installation on-site takes 12-15 days, with a 12-month warranty and turnkey service.
Who Is This Capacity For?
Capacity of 500-900 people for large residential and institutional projects:
- Large hotels — 100-200 room resort, boutique hotel
- Residential complexes — mega project area with 150-300 apartments
- University campuses — dormitory + academic building
- Hospitals and health centers — 50-100 bed
- Military facilities — barracks, training center, logistics camp
- Industrial parks — small organized industrial zone, organized small industry
- Shopping centers — medium-sized shopping mall
Typical Use Scenarios
Typical usage examples:
- 150-room resort hotel (Antalya/Bodrum): Treats water for use in landscaping instead of discharging into the sea.
- 300-apartment complex (Istanbul): Pre-treatment before discharge to municipal sewage — more economical subscription.
- 100-bed city hospital: UV disinfection + advanced biological N-P removal standard.
- Medium factory within an organized industrial zone: Pre-treatment to meet sectoral discharge limits.
Proposed Technology
The technology we recommend for this capacity:
- MBR (Membrane Bioreactor) — standard if there is a water recovery target
- Advanced biological N-P removal — for Turkey's SKKY advanced limits
- UV disinfection — for hospitals, hotels, public areas
- Sludge thickening — decanter or belt press
- PLC SCADA automation — remote monitoring
*The MBR + UV + advanced N-P combination is standard in resort hotel and hospital projects.*
Technical Details
Technical specifications (for 800 people / 155-160 m³/day):
- Reactor material: ST37 carbon steel, 4-6 mm thickness
- Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
- BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
- COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
- SS removal: 95+% (outlet 20-30 mg/L)
- NH4-N removal: 85-90% (advanced biological process)
- Automation: PLC controlled, SCADA remote monitoring optional
- Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
- Footprint: Reactor only + 1 m service area
- Warranty: Mechanical 12 months, body 5 years
- Certificates: CE, ISO 9001, ISO 14001
Investment & Return
Investment analysis for a system with 800 people:
- Annual treated water: ~58,400 m³
- Reusable water (for irrigation): ~49,640 m³ (%85)
- Operational savings (water bill): Between 25-40% of total annual water expenses
- Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
- Prevention of environmental compliance fines: Severe penalties for exceeding discharge limits
- Estimated payback period: Typically between 2-4 years
- Equipment lifespan: 15-20 years (over 70% of investment lifespan is profit)
- Sustainability: Direct contribution to the conservation of water resources
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
800 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.