2000 Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 2000 people — daily flow rate of 395-400 m³/day, installation in 18-22 days.

2000
Person Capacity
395-400 m³/gün
Daily Flow
2.50×13.50×2.80 m
Dimensions (W×L×H)
18-22 gün
Installation Time
ARBİO-2000
Model Code

A package treatment plant for 2000 people is manufactured in our Ankara factory in Turkey under the model name ARBİO-2000. The system, with a daily wastewater treatment capacity of 395-400 m³/day, is made of ST37 carbon steel body (4-6 mm) and has a lifespan of 15-20 years. On-site installation takes 18-22 days, with a 12-month warranty and turnkey service.

Who Is This Capacity For?

Capacity for 2000-4000 people for mega settlements and public projects:

  • Mega resort hotels — holiday villages with 400-800 rooms
  • Neighborhood scale settlements — 600-1500 apartments
  • City hospitals — complexes with 250-500 beds
  • University mega campuses — 5000+ students
  • OSB joint wastewater — small-medium organized industrial zone
  • Municipality/small town — sewage treatment
  • Industrial mega facilities — large factory complex

Typical Use Scenarios

Typical usage examples:

  • 800-room resort (Maldives style): Luxury tourism + reuse in irrigation + MBR option possible.
  • Town/county municipality: Central wastewater treatment for a settlement with a population of 3000-4000.
  • 30-factory organized industrial zone: Each factory discharges after pre-treatment to a common central facility — sectoral filter.
  • 500-bed city hospital: Mega health complex — strict discharge limits.
  • University mega campus: 5000-10000 students + dormitory + social facilities.

Proposed Technology

The technology we recommend for this capacity:

  • Classic activated sludge + advanced N-P removal — the most economical for this scale
  • MBR optional — if there is a strict water recovery target
  • Sludge stabilization — anaerobic or aerobic
  • Sludge dewatering — industrial decanter
  • Complete SCADA + redundancy — critical capacity, downtime is not acceptable
  • Online monitoring sensors — pH, DO, MLSS, BOİ proxy

Technical Details

Technical specifications (for 2000 people / 395-400 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certifications: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a 2000-person system: - Annual treated water: ~146,000 m³ - Reusable water (for irrigation): ~124,100 m³ (85%) - Operational savings (water bill): Between 25-40% of total annual water expenses - Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region - Prevention of environmental compliance penalties: Serious penalties for exceeding discharge limits - Estimated payback period: Typically between 2-4 years - Equipment lifespan: 15-20 years (over 70% of investment lifespan is profit) - Sustainability: Direct contribution to the conservation of water resources

Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance

2000 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın

Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.

Write via WhatsApp Get a Quick Quote