The packaged treatment plant for 300 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-300. The system has a daily wastewater treatment capacity of 55-60 m³/day and features a ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. On-site installation takes 7-10 days, with a 12-month warranty and turnkey service.
Who Is This Capacity For?
Capacity of 300-500 people designed for medium-sized settlements and businesses:
- Medium-sized hotels — holiday resorts with 50-100 rooms
- Apartment complexes — complexes with 80-150 apartments
- School campuses — primary-secondary schools, kindergartens
- Health centers and clinics — small health facilities
- Industrial campuses — small-medium factories
- Sports facilities and camps — summer schools, youth camps
Typical Use Scenarios
Typical usage examples:
- 300-room 4-star hotel: Sufficient capacity for high occupancy during the summer season, reuse of treated water for irrigation.
- 150-apartment site: To avoid overloading the municipal wastewater system in medium-large urban residential projects.
- Private school with 500 students: Kitchen + sports facilities + service workshop treated in a single facility.
- 75-bed hospital: UV disinfection is mandatory for healthcare wastewater — standard addition at these capacities.
Proposed Technology
The technology we recommend for this capacity:
- Conventional activated sludge — basic setup
- MBR optional — if 95% of the treated water will be reused for irrigation
- UV disinfection — mandatory for hospital/hotel/public facilities
- Advanced N-P removal — if there are strict discharge limits
*The MBR + UV combination is common in hotel/hospital projects.*
Technical Details
Technical specifications (for 300 people / 55-60 m³/day):
- Reactor material: ST37 carbon steel, 4-6 mm thickness
- Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
- BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
- COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
- SS removal: 95+% (outlet 20-30 mg/L)
- NH4-N removal: 85-90% (advanced biological process)
- Automation: PLC controlled, SCADA remote monitoring optional
- Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
- Footprint: Reactor only + 1 m service area
- Warranty: Mechanical 12 months, body 5 years
- Certifications: CE, ISO 9001, ISO 14001
Investment & Return
Investment analysis for a system with 300 people:
- Annual treated water: ~21,900 m³
- Reusable water (for irrigation): ~18,615 m³ (85%)
- Operational savings (water bill): Between 25-40% of total annual water expenses
- Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
- Prevention of environmental compliance penalties: Serious penalties for exceeding discharge limits
- Estimated payback period: Typically between 2-4 years
- Equipment lifespan: 15-20 years (more than 70% of investment lifespan is profit)
- Sustainability: Direct contribution to the conservation of water resources
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
300-Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.