Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 19 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

300-Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 300 people — daily flow rate of 55-60 m³/day, 7-10 days installation.

300
Person Capacity
55-60 m³/gün
Daily Flow
2.20×6.75×2.70 m
Dimensions (W×L×H)
7-10 gün
Installation Time
ARBİO-300
Model Code

The packaged treatment plant for 300 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-300. The system has a daily wastewater treatment capacity of 55-60 m³/day and features a ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. On-site installation takes 7-10 days, with a 12-month warranty and turnkey service.

Who Is This Capacity For?

Capacity of 300-500 people designed for medium-sized settlements and businesses:

  • Medium-sized hotels — holiday resorts with 50-100 rooms
  • Apartment complexes — complexes with 80-150 apartments
  • School campuses — primary-secondary schools, kindergartens
  • Health centers and clinics — small health facilities
  • Industrial campuses — small-medium factories
  • Sports facilities and camps — summer schools, youth camps

Typical Use Scenarios

Typical usage examples:

  • 300-room 4-star hotel: Sufficient capacity for high occupancy during the summer season, reuse of treated water for irrigation.
  • 150-apartment site: To avoid overloading the municipal wastewater system in medium-large urban residential projects.
  • Private school with 500 students: Kitchen + sports facilities + service workshop treated in a single facility.
  • 75-bed hospital: UV disinfection is mandatory for healthcare wastewater — standard addition at these capacities.

Proposed Technology

The technology we recommend for this capacity:

  • Conventional activated sludge — basic setup
  • MBR optional — if 95% of the treated water will be reused for irrigation
  • UV disinfection — mandatory for hospital/hotel/public facilities
  • Advanced N-P removal — if there are strict discharge limits

*The MBR + UV combination is common in hotel/hospital projects.*

Technical Details

Technical specifications (for 300 people / 55-60 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certifications: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a system with 300 people:

  • Annual treated water: ~21,900 m³
  • Reusable water (for irrigation): ~18,615 m³ (85%)
  • Operational savings (water bill): Between 25-40% of total annual water expenses
  • Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
  • Prevention of environmental compliance penalties: Serious penalties for exceeding discharge limits
  • Estimated payback period: Typically between 2-4 years
  • Equipment lifespan: 15-20 years (more than 70% of investment lifespan is profit)
  • Sustainability: Direct contribution to the conservation of water resources
Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance

300-Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın

Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.

Write via WhatsApp Get a Quick Quote