Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 19 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

8000 Person Package Treatment Plant

Ultra-mega capacity wastewater treatment plant for 8000 people — daily flow rate of 1595-1600 m³/day, 48-65 days installation, municipal/OSB scale

8000
Person Capacity
1595-1600 m³/gün
Daily Flow
3.50×28.00×3.20 m
Dimensions (W×L×H)
48-65 gün
Installation Time
ARBİO-8000
Model Code

The 8000-person packaged treatment plant is designed for mega-scale projects under the model name ARBİO-8000. With a daily wastewater treatment capacity of 1595-1600 m³/day, the system is optimal for town municipalities, mega industrial zones, ultra-luxury resorts, mega hospitals, or industrial complexes. It offers a choice of modular hybrid steel plant or conventional concrete plant. Turnkey engineering + manufacturing + shipping + installation.

Who Is This Capacity For?

Ultra-mega capacity for over 8,000 people designed for municipalities, OSB centers, and large industrial complexes:

  • Town/county municipality wastewater — urban sewage main treatment
  • Mega OSB central facility — organized industrial zone with 100+ factories
  • Ultra-luxury mega resort — world brand holiday villages with 2000+ rooms
  • City hospital complexes — multidisciplinary campuses with 1000+ beds
  • Mega university campuses — 30,000+ students + dormitory + social facilities
  • Military base/garrison — regional command center
  • Mega industrial complex — petrochemical, steel, food mega factories
  • Airport + logistics centers — large operational campuses

Typical Use Scenarios

Typical usage examples (mega scale):

  • Municipality with a population of 12,000: Urban wastewater fully centralized treatment, end discharge point of the sewer infrastructure.
  • Mega industrial zone with 100+ factories: Centralized biological + advanced treatment after sectoral pre-treatment.
  • Mega resort (2500+ rooms): Water recovery + 95% reuse in irrigation — annual savings of million m³.
  • Mega hospital campus with 1000+ beds: UV + MBR + advanced N-P + advanced biological — strict health wastewater profile.
  • Mega university with 30,000 students: Dormitory + academic + social facilities treated at a single point.

Important: For this capacity, instead of a packaged system, classical activated sludge plant or conventional MBR plant is often more economical. Alternatives are evaluated after field analysis.

Proposed Technology

The technology we recommend for this capacity:

  • Conventional activated sludge plant — an open concrete facility is more economical than a package plant at this scale
  • Advanced biological N-P removal — A2/O, UCT, or Bardenpho process
  • MBR retrofit infrastructure — ready for water recovery in the future
  • Anaerobic sludge stabilization — biogas production + energy recovery
  • Industrial dewatering — centrifuge decanter + thermal drying
  • DCS full automation — 24/7 monitoring + alarm + reporting + remote control
  • Online monitoring — pH, DO, MLSS, BOİ proxy, turbidity, flow rate
  • Redundancy — 100%+50% capacity in critical equipment
  • API separator + IAF — for industrial wastewater containing oil

*If a package system is offered at this capacity, a modular hybrid solution (2 or 3 parallel modules) will be provided.*

Technical Details

Technical specifications (8000 people / 1595-1600 m³/day):

  • Reactor material: ST37 carbon steel body (modular hybrid) or concrete plant
  • Corrosion protection: Epoxy paint + bituminous coating, 20-25 years lifespan
  • BOD removal: %94-97 (inlet 300-500 mg/L → outlet 10-18 mg/L)
  • COD removal: %90-95 (inlet 600-900 mg/L → outlet 60-90 mg/L)
  • SS removal: %96+ (outlet 15-25 mg/L)
  • NH4-N removal: %90-95 (A2/O advanced biological process)
  • Total N removal: %80-88
  • Total P removal: %85-92 (chemical + biological)
  • Automation: PLC + SCADA + DCS optional, full redundancy
  • Energy consumption: Typical 0.35-0.55 kWh/m³ (mega scale efficiency increase)
  • Bed area: Modular hybrid or open plant — according to field analysis
  • Warranty: Mechanical 12 months (extendable to 24 months), body 10 years
  • Certificates: CE, ISO 9001/14001/45001, OHSAS
  • Sludge treatment: Dewatering + optional drying + biogas production

Investment & Return

Investment analysis for a system with 8000 people:

  • Annual treated water: ~582,175 m³
  • Reusable water (for irrigation/process): ~523,958 m³ (90% — high efficiency at a mega scale)
  • Operational savings: Between 30-50% of total annual water expenses
  • Avoidance of municipal sewer fees: Additional savings of +40-60% depending on the region
  • Biogas production potential: Electricity generation through anaerobic sludge stabilization
  • Prevention of environmental compliance penalties: Risk of million TL fines for exceeding discharge limits
  • Estimated payback period: Typically between 3-6 years
  • Equipment lifespan: 20-30 years (mega scale investment — long-lasting)
  • Sustainability: ESG reporting + carbon credit potential
Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance

8000 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın

Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.

Write via WhatsApp Get a Quick Quote