The 200-person packaged treatment plant is manufactured at our Ankara factory in Turkey under the model name ARBİO-200. The system, with a daily wastewater treatment capacity of 40 m³/day, features a ST37 carbon steel body (4-6 mm) and has a lifespan of 15-20 years. On-site installation takes 6-9 days, comes with a 12-month warranty, and is provided as a turnkey service.
Who Is This Capacity For?
Capacity for 100-300 people is ideal for the following applications:
- Small villas and site complexes — residential buildings with 20-60 apartments
- Construction sites and temporary facilities — construction areas, camps
- Small hotels and guesthouses — 20-40 rooms
- Restaurants and catering businesses — high daily customer volume
- Small manufacturing facilities — workshops, carpentry, small food production
- Village and hamlet wastewater — areas without sewer infrastructure
Typical Use Scenarios
Typical usage examples (field experience):
- 15-unit villa complex (60 people): ARBİO-100 treats 15-20 m³ of wastewater per day, providing 85% reuse for landscape irrigation.
- 30-room boutique hotel: Low season 80 people, high season 90 people — the packaged system automatically balances flow according to occupancy.
- Construction site camp (200 workers): Quick installation (5 days), can be dismantled at the end of the construction site and reused in another project.
- Village settlement (250 population): In villages without municipal infrastructure, the packaged system is the most economical solution.
Proposed Technology
The technology we recommend for this capacity:
- Classic biological active sludge (packaged biological) — the most economical, simple operation
- Air blower — between 0.75-2.2 kW, low energy
- Chlorine disinfection — standard, hypochlorite dosing
- Automatic control — simple automation at PLC Logo level is sufficient
*MBR systems are financially excessive at these capacities — packaged biological is sufficient.*
Technical Details
Technical specifications (200 people / 40 m³/day):
- Reactor material: ST37 carbon steel, 4-6 mm thickness
- Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
- BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
- COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
- TSS removal: 95+% (outlet 20-30 mg/L)
- NH4-N removal: 85-90% (advanced biological process)
- Automation: PLC controlled, SCADA remote monitoring optional
- Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
- Footprint: Reactor only + 1 m service area
- Warranty: Mechanical 12 months, body 5 years
- Certifications: CE, ISO 9001, ISO 14001
Investment & Return
Investment analysis for a system of 200 people:
- Annual treated water: ~14,600 m³
- Reusable water (for irrigation): ~12,410 m³ (85%)
- Operational savings (water bill): Between 25-40% of total annual water expenses
- Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
- Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits
- Estimated payback period: Typically between 2-4 years
- Equipment lifespan: 15-20 years (over 70% of investment lifespan is profit)
- Sustainability: Direct contribution to the conservation of water resources
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
200 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.