Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

AHKA

Year 2025
Region Burdur
Country Turkey
Capacity 1000 Person / Day Capacity
Process Package Treatment Plant
Client AHKA Ltd.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

package treatment - AHKA

AHKA LTD. This package treatment project, carried out in Burdur, has a capacity of 1000 Persons / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Burdur
Client / Institution Mehmet Akif Ersoy University
Capacity 1000 Persons / Day Capacity
Process Type Package Treatment Facility
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.


Wastewater Characteristics of Training Facility

Education facilities produce domestic character wastewater. The number of students and staff is a fundamental sizing criterion. Additionally, the seasonal usage profile (academic calendar) is taken into account. The logic of recycle is critically important for low usage periods.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Package Treatment guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address various aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, particularly in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote