Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

AO Smith Inc.

Year 2025
Region Türkmenistan
Country Turkmenistan
Capacity -
Process Industrial Wastewater Treatment Plant
Client AO Smith Inc.

Project Gallery Görseller yakında eklenecek

About the Turkmenistan Wastewater Treatment Plant Project

Turkmenistan - AO Smith Inc.

AO Smith Inc. for the wastewater treatment facility project carried out in Turkmenistan is - capacity. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Turkmenistan
Capacity -
Process Type Industrial Wastewater Treatment Plant
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

Industrial wastewater treatment plant targets a composition specific to the industry. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.


Sectoral Wastewater Assessment

Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This has maximized operational continuity and energy efficiency. For detailed technical information, the Industrial wastewater treatment guide can be reviewed. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of wastewater treatment plants. For more information, you can contact us through our contact page and request a quote for your project.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote