Project Details
About the Basra Wastewater Treatment Plant Project

This wastewater treatment plant project in Basra, Iraq, for the Al-Zubair Slaughterhouse has a capacity of 100 m³ / Day. The project will be completed as a turnkey solution in 2024. Additionally, the design, equipment procurement, installation, and commissioning processes have been carried out by our company. This ensures a coordinated and error-free delivery to the customer.
The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.
The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent meets discharge limits.
Slaughterhouse wastewater contains high levels of blood, fats, oils, and grease (FOG) and organic load. The KOİ values typically range from 3,000 to 8,000 mg/L. Additionally, nitrogen and phosphorus concentrations are also high. DAF (Dissolved Air Flotation) pre-treatment is essential in this sector. Subsequently, high-efficiency treatment is achieved through biological processes.
At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Slaughterhouse Wastewater Treatment Guide. Also, our articles such as how industrial wastewater is treated and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical proposals. Additionally, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of wastewater treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Get a Quote for a Similar Project
Free site survey · 24h quote · 20+ years experience