Project Details
About the Bingöl Wastewater Treatment Plant Project

This wastewater treatment plant project, carried out in Bingöl for the Bingöl Organized Industrial Zone, has a capacity of 800 m³ / Day. It has been conducted under the Ministry of Industry of the Republic of Turkey. The project is scheduled to be completed in 2025 as a turnkey delivery. Additionally, the design, equipment procurement, installation, and commissioning processes have been carried out by our company. This ensures a coordinated and error-free delivery to the client.
Technical Specifications and Capacity
The fundamental technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.
Applied Wastewater Treatment Plant Technology
The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is employed. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent water becomes compliant with discharge limits.
OSB Wastewater Management
Wastewaters from the Organized Industrial Zone are a heterogeneous mixture from different sectors. The acceptance standards of member factories are fundamental to success. Additionally, the central facility should be designed with a multi-barrier structure. Automation and continuous monitoring are essential for a modern OSB facility.
Conclusion and Reference Value
At the end of the project, the effluent water was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, the OSB wastewater treatment plant guide can be reviewed. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical proposals. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of wastewater treatment plants, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Onsite assembly and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting