Project Details
About the Bingöl Wastewater Treatment Plant Project

This wastewater treatment plant project, carried out in Bingöl for the Bingöl Organized Industrial Zone, has a capacity of 800 m³ / Day. It has been conducted under the Ministry of Industry of the Republic of Turkey. The project will be completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes have been carried out by our company. This ensures a coordinated and error-free delivery to the customer.
Technical Specifications and Capacity
The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.
Applied Wastewater Treatment Plant Technology
The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the discharge water becomes compliant with discharge limits.
OSB Wastewater Management
The wastewater from the Organized Industrial Zone is a heterogeneous mixture from different sectors. Acceptance standards of member factories are key to success. Additionally, the central facility must be designed with a multi-barrier structure. Automation and continuous monitoring are essential for a modern OSB facility.
Outcome and Reference Value
At the end of the project, the discharge water is produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Furthermore, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, the OSB wastewater treatment plant guide can be reviewed. Additionally, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant field, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps have been carried out by our company. Thus, the turnkey delivery process has been completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Field assembly and hydraulic testssite assembly and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting