Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Bingöl Organized Industrial Zone

Published: ~2 min read
Year
2025
Region
Bingöl
Country
Capacity
800 m³ / Day Capacity
Process
Industrial Wastewater Treatment Facility
Client
Bingöl Organized Industrial Zone

Project Details

About the Bingöl Wastewater Treatment Facility Project

Bingöl - Bingöl Organized Industrial Zone

Bingöl Organized Industrial Zone wastewater treatment plant project, carried out in Bingöl, has a capacity of 800 m³ / Day. It has been conducted under the Ministry of Industry of the Republic of Turkey. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and flawless delivery to the customer from a single source.

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Bingöl
Client / Institution Ministry of Industry of the Republic of Turkey
Capacity 800 m³ / Day Capacity
Process Type Industrial Wastewater Treatment Plant
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Industrial wastewater treatment facility targets a sector-specific composition. A multi-barrier approach is utilized. This approach encompasses pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.

The wastewater of the Organized Industrial Zone is a heterogeneous mixture of different sectors. The acceptance standards of member factories are the foundation of success. Additionally, the central facility should be designed with a multi-barrier structure. Automation and continuous monitoring are essential for a modern OSB facility.

At the end of the project, the discharge water is produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the OSB wastewater treatment plant guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. Especially in the field of wastewater treatment plants, we provide reliable solutions to the industry with over 20 years of experience. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote