Project Details
About the Bingöl Wastewater Treatment Facility Project

Bingöl Organized Industrial Zone wastewater treatment plant project, carried out in Bingöl, has a capacity of 800 m³ / Day. It has been conducted under the Ministry of Industry of the Republic of Turkey. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and flawless delivery to the customer from a single source.
The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.
Industrial wastewater treatment facility targets a sector-specific composition. A multi-barrier approach is utilized. This approach encompasses pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.
The wastewater of the Organized Industrial Zone is a heterogeneous mixture of different sectors. The acceptance standards of member factories are the foundation of success. Additionally, the central facility should be designed with a multi-barrier structure. Automation and continuous monitoring are essential for a modern OSB facility.
At the end of the project, the discharge water is produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the OSB wastewater treatment plant guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. Especially in the field of wastewater treatment plants, we provide reliable solutions to the industry with over 20 years of experience. For more information, you can contact us through our contact page.
Frequently Asked Questions
Get a Quote for a Similar Project
Free site survey · 24h quote · 20+ years experience