Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Bintaş Construction Inc.

Year 2024
Region Bingöl
Country Turkey
Capacity 2000 Person / Day Capacity
Process Package Treatment Plant
Client Bintaş Construction Inc.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - Bintaş Construction Inc.

Bintaş Construction Inc. has implemented this package treatment project in Bingöl with a capacity of 2000 Persons / Day. The project was completed in 2024 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project LocationBingöl
Client / InstitutionTOKİ
CapacityCapacity for 2000 People / Day
Process TypePackage Treatment Facility
Completion Year2024
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.


Residential Project Wastewater Characteristics

TOKİ and mass housing projects generate domestic wastewater. Sizing according to the number of users is critical. Additionally, the possibility of modular expansion provides a significant advantage for social structure projects. Fast installation is preferred in line with the construction site process through package solutions.


Result and Reference Value

At the end of the project, the effluent water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles also address different aspects of the topic, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide.

For similar capacities and sectoral needs, our engineering team at Arsistek provides free preliminary studies and technical suggestions. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote