Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Çitlekçi Dried Fruits Inc.

Sector Food Industry
Year 2026
Region Kırıkkale
Country Turkey
Capacity 1000 Person / Day Capacity
Process Package Treatment Plant
Client Çitlekçi Dried Fruits Inc.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - Çitlekçi Dried Fruits Inc.

Çitlekçi Dried Fruits Inc. for this package treatment project carried out in Kırıkkale has a capacity of 1000 Persons / Day. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Kırıkkale
Capacity 1000 Persons / Day Capacity
Process Type Package Treatment Facility
Completion Year 2026
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution that is pre-manufactured in a factory environment. All process equipment is collected in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.


Sectoral Wastewater Assessment

Correct engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This has maximized operational continuity and energy efficiency. For detailed technical information, you can refer to the Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote