Sepetçioğlu Dairy Products Inc.
Project Gallery Görseller yakında eklenecek
About the Sepetçioğlu Wastewater Treatment Plant Project

The wastewater treatment facility project carried out in Kastamonu for Sepetçioğlu Dairy Products has a capacity of 25 m³ / Day. The project was completed in 2015 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.
Applied Wastewater Treatment Plant Technology
Industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.
Wastewater Characteristics of the Dairy Industry
The dairy sector wastewater contains high COD (1,500-6,000 mg/L) and FOG. CIP washings cause pH fluctuations. Biological degradability is high (BOD/COD 0.7+). Additionally, the anaerobic process provides economic benefits through biogas utilization. The dairy sector can meet a significant portion of its facility energy needs with the biogas it produces.
Result and Reference Value
Sepetçioğlu Kastamonu campus wastewater treatment facility project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Dairy Factory Wastewater Treatment Guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience specifically in the wastewater treatment facility sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Get a Quote for a Similar Project
Free site survey · 24h quote · 20+ years experience




