Fatsa Slaughterhouse

Year 2017
Region Ordu
Country Turkey
Capacity 400 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Fatsa Slaughterhouse

Project Gallery Görseller yakında eklenecek

About the Ordu Wastewater Treatment Plant Project

Ordu - Fatsa Slaughterhouse

The wastewater treatment plant project carried out in Ordu for the Fatsa Slaughterhouse has a capacity of 400 m³ / Day. It has been conducted under the auspices of the Fatsa Municipality. The project was completed in 2017 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Applied Wastewater Treatment Plant Technology

Industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.

Project Technical Information
Project Location Ordu / Fatsa
Capacity 400 m³ / Day Capacity
Process Type Chemical + Biological Slaughterhouse Wastewater Treatment Plant
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Wastewater Characteristics of the Slaughterhouse Sector

Slaughterhouse wastewater contains high levels of blood, fat-oil-grease (FOG), and organic load. COD values typically range between 3,000-8,000 mg/L. Additionally, nitrogen and phosphorus concentrations are also high. DAF (Dissolved Air Flotation) pre-treatment is mandatory in this sector. Subsequently, high-efficiency treatment is achieved through a biological process.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Slaughterhouse wastewater treatment guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of wastewater treatment plants. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote