Gemak Inc.

Year 2021
Region Ankara
Country Turkey
Capacity 100 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Gemak Inc.

Project Gallery Görseller yakında eklenecek

About the Gemak Wastewater Treatment Plant Project

Gemak Inc. for the wastewater treatment facility project carried out in Ankara has a capacity of 100 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were conducted within our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Ankara
Capacity 100 m³ / Day Capacity
Process Type Industrial Wastewater Treatment Plant
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

Gemak Milk Treatment

Gemak Inc. Milk wastewater treatment facility targets a composition specific to the industry. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent water becomes compliant with discharge limits.


Sectoral Wastewater Evaluation

Correct engineering design is fundamental to the success of the project. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  • Wastewater characterization analysis and sample examination
  • Process design and engineering calculations
  • Mechanical, electrical, and automation documentation
  • Equipment procurement and factory acceptance tests
  • On-site assembly and hydraulic tests
  • Biological adaptation and commissioning
  • Operator training and delivery of technical documentation
  • SKKY compliance tests and official reporting

Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of wastewater treatment plants. For more information, you can contact us through our contact page.