Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Izmir Open Prison Institution

Sector Correctional Institution
Year 2017
Region İzmir
Country Turkey
Capacity Revision
Process Supply of Mechanical Equipment (Diffuser)
Client Izmir Open Prison Institution

Project Gallery Görseller yakında eklenecek

About the İzmir Open Prison Wastewater Treatment Facility Project

Izmir - Izmir Open Penal Institution

The wastewater treatment facility project carried out in Izmir for the Izmir Open Penal Institution has a Revision capacity. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2017 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Applied Wastewater Treatment Plant Technology

Supply of mechanical equipment and materials includes selection, procurement, and installation processes. Pumps, blowers, diffusers, valves, and dosing systems are the main equipment. Additionally, SCADA automation integration may be part of the project.

Project Technical Information
Project Location İzmir
Capacity Mechanical Equipment - Diffuser
Process Type Wastewater Treatment Plant Equipment
Completion Year 2017
Discharge Standard SKKY (Water Pollution Control Regulation)

Closed Facility Wastewater Characteristics

Correctional facilities produce domestic wastewater. Due to closed environment conditions, they provide a balanced flow profile. Therefore, package systems are the ideal solution. Additionally, high disinfection and continuous operational reliability are prioritized.


Result and Reference Value

As a result of the İzmir Open Penal Institution Equipment Supply Project, the effluent has been produced at a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote