Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

WOW Topkapı Palace Hotel

Sector Hotel Wastewater Treatment
Year 2017
Region Antalya
Country Turkey
Capacity 3000 Person / Day Capacity
Process Package Treatment Plant
Client WOW Topkapı Palace Hotel

Project Gallery Görseller yakında eklenecek

About the WOW Topkapı Palace Hotel Package Treatment Project

Package Treatment - WOW Topkapı Palace Hotel

WOW Topkapı Palace Hotel is a package treatment project carried out in Antalya with a capacity of 3000 Persons / Day. The project was completed in 2017 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Applied Package Treatment Technology

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.

Project Technical Information
Project Location Antalya
Capacity Package Treatment Facility for 3000 People
Process Type Package Sewage Treatment Facility
Completion Year 2017
Discharge Standard SKKY (Water Pollution Control Regulation)

Characteristics of Wastewater from Tourist Facilities

Touristic facility wastewater shows high seasonal fluctuations. Kitchen-derived fats, oils, and grease (FOG) load is a critical parameter. Modular design and balancing capacity are two fundamental elements of the design. Especially package treatment system solutions are considered ideal for the hotel sector.


Result and Reference Value

The WOW Topkapı Palace Hotel Treatment Project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Package Treatment guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consultancy services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote