Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Kars Correctional Institution

Sector Slaughterhouse Wastewater Treatment
Year 2017
Region Kars
Country Turkey
Capacity 300 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Kars Correctional Institution

Project Gallery Görseller yakında eklenecek

About the Kars Wastewater Treatment Plant Project

Kars - Kars Penal Institution

The wastewater treatment facility project carried out in Kars for the Kars Penal Institution has a capacity of 300 m³ / Day. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2017 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out by our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Applied Wastewater Treatment Plant Technology

Kars Prison slaughterhouse industrial wastewater treatment facility targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the discharge water becomes compliant with discharge limits.

Project Technical Information
Project Location Kars
Capacity 300 m³ / Day Capacity
Process Type Chemical + Biological Slaughterhouse Wastewater Treatment Facility
Completion Year 2017
Discharge Standard SKKY (Water Pollution Control Regulation)

Closed Facility Wastewater Characteristics

Correctional facilities produce domestic wastewater. Due to closed environment conditions, they offer a balanced flow profile. Therefore, package systems are the ideal solution. Additionally, high disinfection and continuous operational reliability are prioritized.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary study and technical advice. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of wastewater treatment plants, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote