About the Kırşehir Wastewater Treatment Plant Project

This wastewater treatment plant project carried out in Kırşehir for the Kırşehir Open Penal Institution is revision capacity. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.
Technical Specifications and Capacity
The fundamental technical parameters of the project are summarized in the table below. This information provides a snapshot of the project's scope, engineering requirements, and delivery process.
Applied Wastewater Treatment Plant Technology
The plant revision and modernization work updates the existing structure. The goal is compliance with current regulations. Additionally, capacity needs or energy efficiency targets are considered. During this process, the plant operation is optimized.
Closed Facility Wastewater Characteristics
Penal institutions produce domestic character wastewater. Due to closed environment conditions, they present a balanced flow profile. Therefore, packaged systems are ideal solutions. Furthermore, high disinfection and continuous operational reliability are prioritized.
Conclusion and Reference Value
At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the plant is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Industrial wastewater treatment guide. Moreover, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Field assembly and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting