Project Details

About the Kırşehir Wastewater Treatment Plant Project

Kırşehir - Kırşehir Open Penal Institution

This wastewater treatment plant project carried out in Kırşehir for the Kırşehir Open Penal Institution is revision capacity. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides a snapshot of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationKırşehir
Client / InstitutionMinistry of Justice of the Republic of Turkey
CapacityRevision
Process TypeRevision
Completion Year2022
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

The plant revision and modernization work updates the existing structure. The goal is compliance with current regulations. Additionally, capacity needs or energy efficiency targets are considered. During this process, the plant operation is optimized.

Closed Facility Wastewater Characteristics

Penal institutions produce domestic character wastewater. Due to closed environment conditions, they present a balanced flow profile. Therefore, packaged systems are ideal solutions. Furthermore, high disinfection and continuous operational reliability are prioritized.

Conclusion and Reference Value

At the end of the project, the effluent was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the plant is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Industrial wastewater treatment guide. Moreover, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    Field assembly and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting