About the Kırşehir Slaughterhouse Treatment Plant Project

Kırşehir Slaughterhouse wastewater treatment plant project implemented in Kırşehir has a capacity of 200 m³ / Day. The project was completed in 2023 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.
The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.
Industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.
Slaughterhouse wastewater contains high levels of blood, fats, oils, and grease (FOG) and organic load. COD values typically range between 3,000-8,000 mg/L. Additionally, nitrogen and phosphorus concentrations are also high. DAF (Dissolved Air Flotation) pre-treatment is mandatory in this sector. Subsequently, high-efficiency treatment is achieved through a biological process.
The Kırşehir slaughterhouse treatment project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can review our Slaughterhouse Wastewater Treatment Guide. Furthermore, articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of wastewater treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Sources and Relevant Standards
Related Projects
Other reference projects in the same sector and process type.
Get a Quote for a Similar Project
Free site survey · 24h quote · 20+ years experience