Miks Textile Inc.

Year 2021
Region Kahramanmaraş
Country Turkey
Capacity 1350 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Miks Textile Inc.

Project Gallery Görseller yakında eklenecek

About the Miks Tekstil Wastewater Treatment Plant Project

Miks Textile Inc. for the wastewater treatment facility project carried out in Kahramanmaraş has a capacity of 1350 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Kahramanmaraş
Capacity 1350 m³ / Day Capacity
Process Type Industrial Wastewater Treatment Plant
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

Industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.


Wastewater Characteristics of the Textile Sector

Textile wastewater contains high salinity and refractory dye substances. The BOD/COD ratio is low (0.1-0.3). Therefore, biological treatment alone is insufficient. For color removal, ozonation, Fenton, or electrocoagulation is applied. The outlet ADMI value is kept below 280.


Project Scope and Workflow

The Mix Textile Treatment Plant Project; the following steps have been carried out by our company during its course. Thus, the turnkey delivery process has been completed smoothly.

  • Wastewater characterization analysis and sample examination
  • Process design and engineering calculations
  • Mechanical, electrical, and automation documentation
  • Equipment procurement and factory acceptance tests
  • On-site assembly and hydraulic tests
  • Biological adaptation and commissioning
  • Operator training and technical documentation delivery
  • SKKY compliance tests and official reporting

Result and Reference Value

At the end of the project, the effluent has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Color Removal Guide in Textiles. Furthermore, our articles such as Industrial Wastewater Treatment Methods and SKKY Discharge Limits 2026 Guide address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, particularly in the field of wastewater treatment plants. For more information, you can contact us through our contact page.