Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Samsun Homeland Defense Inc.

Sector Defense Industry
Year 2015
Region Samsun
Country Turkey
Capacity 10 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Samsun Yurt Savunma Inc.

Project Gallery Görseller yakında eklenecek

About the Samsun Wastewater Treatment Plant Project

Samsun - Samsun Yurt Savunma Inc.

Samsun Yurt Savunma Inc. for this wastewater treatment plant project realized in Samsun has a capacity of 10 m³ / Day. The project was completed in 2015 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source. Please contact us for similar project requests.


Applied Wastewater Treatment Plant Technology

Samsun Yurt Savunma Inc. Samsun facilities industrial wastewater treatment plant project targets a composition specific to the industry. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.

Project Technical Information
Project Location Samsun
Capacity
Process Type Chemical Wastewater Treatment Plant
Completion Year 2015
Discharge Standard Compliance with OSB Discharge Limits

Sectoral Wastewater Evaluation

Correct engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

The Samsun Yurt Savunma Inc. wastewater treatment plant project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Our articles also address different aspects of the topic, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide.

For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for the capacity increase or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote