Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Sincan Open Penal Institution

Year 2022
Region Ankara
Country Turkey
Capacity Revision
Process Heat Center Line
Client Sincan Open Prison Institution

Project Gallery Görseller yakında eklenecek

About the Ankara Wastewater Treatment Plant Project

Ankara - Sincan Open Penitentiary Institution

Sincan Open Penitentiary Institution wastewater treatment plant project carried out in Ankara is Revision capacity. It has been conducted under the Ministry of Justice of the Republic of Turkey. The project was completed in 2022 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes have been carried out within our company. This has ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project Location Ankara
Client / Institution Ministry of Justice of the Republic of Turkey
Capacity Revision
Process Type Heat Center Line
Completion Year 2022
Discharge Standard SKKY (Water Pollution Control Regulation)

Sincan Open Prison Facility Technology

The facility has been designed with process stages suitable for the characterization of wastewater. Additionally, it has been optimized to meet the target discharge limits.


Characteristics of Closed Facility Wastewater

Correctional facilities produce domestic wastewater. Due to closed environment conditions, they provide a balanced flow profile. Therefore, package systems are the ideal solution. Additionally, high disinfection and continuous operational reliability are prioritized.


Result and Reference Value

The Sincan Open Penitentiary Institution Project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of wastewater treatment plants. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote