Online Support +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Karmando Ice Cream Inc.

Published: Updated: ~2 min read
Sector
Food Sector
Year
2021
Region
Kahramanmaraş
Country
Capacity
20 m³ / Day Capacity
Process
Industrial Wastewater Treatment Plant
Client
Karmando Ice Cream Inc.

Project Details

About the Karmando Ice Cream Wastewater Treatment Plant Project

Kahramanmaraş - Karmando Ice Cream

Karmando Ice Cream wastewater treatment facility project carried out in Kahramanmaraş has a capacity of 20 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Kahramanmaraş
Capacity 20 m³ / Day Capacity
Process Type Industrial Wastewater Treatment Plant
Completion Year 2021
Discharge Standard SKKY (Water Pollution Control Regulation)

Karmando Ice Cream Industrial Wastewater Treatment Plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.

The dairy industry wastewater contains high COD (1,500-6,000 mg/L) and FOG. CIP washings cause pH fluctuations. Biological degradability is high (BOD/COD 0.7+). Additionally, biogas utilization through anaerobic processes provides economic benefits. The dairy industry can meet a significant portion of its facility's energy needs with the biogas it produces.

At the end of the project, the effluent has been produced to meet the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Dairy Factory Wastewater Treatment Guide. Furthermore, articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Related Projects

Other reference projects in the same sector and process type.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote