Qatar Aluminum Co.

Year
2021
Region
Kastamonu
Country
Türkiye
Capacity
30 m³ / Gün Kapasiteli
Process
Endüstriyel Atıksu Arıtma Tesisi
Client
Katar Alüminyum A.Ş

Project Details

About the Kastamonu Wastewater Treatment Plant Project

Kastamonu - Qatar Aluminum Inc.

This wastewater treatment plant project carried out for Qatar Aluminum Inc. in Kastamonu has a capacity of 30 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the client.

Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project LocationKastamonu
Capacity30 m³ / Day Capacity
Process TypeIndustrial Wastewater Treatment Plant
Completion Year2021
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent water becomes compliant with discharge limits.

Wastewater Characteristics of the Metal Industry

Wastewaters from the metal industry contain heavy metals (Cr, Ni, Zn, Cu, Pb) and oils. The pH fluctuations are high. Therefore, pre-treatment at the source is critically important. A chemical precipitation + biological treatment multi-barrier approach is applied. The resulting sludge is disposed of as hazardous waste at authorized facilities.

Conclusion and Reference Value

At the end of the project, the effluent water was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Automotive and Metal Industry Wastewater Guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical proposals. Additionally, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience specifically in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Frequently Asked Questions

5 Soru
Our projects are carried out in a 6-stage process: 1) Feasibility and Exploration - Site inspection, wastewater analysis, and capacity determination. 2) Project Design - Process selection, mechanical and electrical projects. 3) Manufacturing - Equipment production in our own facilities. 4) Installation - On-site setup and mechanical/electrical assembly. 5) Commissioning - Testing and performance validation. 6) Operational Support - Training, remote monitoring, and periodic maintenance.
The delivery time varies according to the size of the project. For Package Treatment systems, 2-8 weeks is expected, for medium-sized facilities 2-4 months, and for large-scale industrial projects 4-6 months. An accelerated production schedule can be implemented for urgent needs.
All our systems are under a 2-year parts and labor warranty. Defective parts covered by the warranty will be replaced free of charge. Additionally, we ensure the efficient operation of your facility for a lifetime with the option of an annual maintenance contract after the warranty period. Remote SCADA monitoring provides the possibility for immediate intervention.
You can fill out our contact form for a free exploration and quote, reach us by phone, or send an email. Our expert engineers will review your project and prepare a customized solution and price quote based on your needs. The exploration and feasibility study are free of charge.
We provide services to all provinces across Turkey. Internationally, we have projects in Iraq, Azerbaijan, Libya, Saudi Arabia, and Central Asian countries. We are able to offer turnkey projects globally.

Project Scope and Workflow

During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.

  1. 1
    Wastewater characterization analysis and sample examination
  2. 2
    Process design and engineering calculations
  3. 3
    Mechanical, electrical, and automation documentation
  4. 4
    Equipment procurement and factory acceptance tests
  5. 5
    Field assembly and hydraulic tests
  6. 6
    Biological adaptation and commissioning
  7. 7
    Operator training and technical documentation delivery
  8. 8
    SKKY compliance tests and official reporting