About the Kastamonu Wastewater Treatment Plant Project

This wastewater treatment plant project carried out for Qatar Aluminum Inc. in Kastamonu has a capacity of 30 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the client.
Technical Specifications and Capacity
The fundamental technical parameters of the project are summarized in the table below. This information provides a quick overview of the project's scope, engineering requirements, and delivery process.
Applied Wastewater Treatment Plant Technology
The industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent water becomes compliant with discharge limits.
Wastewater Characteristics of the Metal Industry
Wastewaters from the metal industry contain heavy metals (Cr, Ni, Zn, Cu, Pb) and oils. The pH fluctuations are high. Therefore, pre-treatment at the source is critically important. A chemical precipitation + biological treatment multi-barrier approach is applied. The resulting sludge is disposed of as hazardous waste at authorized facilities.
Conclusion and Reference Value
At the end of the project, the effluent water was produced at a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Automotive and Metal Industry Wastewater Guide. Furthermore, our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary studies and technical proposals. Additionally, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience specifically in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Project Scope and Workflow
During the project, the following steps were carried out by our company. Thus, the turnkey delivery process was completed smoothly.
-
1
Wastewater characterization analysis and sample examination
-
2
Process design and engineering calculations
-
3
Mechanical, electrical, and automation documentation
-
4
Equipment procurement and factory acceptance tests
-
5
Field assembly and hydraulic tests
-
6
Biological adaptation and commissioning
-
7
Operator training and technical documentation delivery
-
8
SKKY compliance tests and official reporting